Crushed Stone Blind Area (24 Photos): What Crushed Stone Is Needed For A Blind Area Around The House? DIY Step-by-step Instructions For Filling, Diagram

Table of contents:

Video: Crushed Stone Blind Area (24 Photos): What Crushed Stone Is Needed For A Blind Area Around The House? DIY Step-by-step Instructions For Filling, Diagram

Video: Crushed Stone Blind Area (24 Photos): What Crushed Stone Is Needed For A Blind Area Around The House? DIY Step-by-step Instructions For Filling, Diagram
Video: How To Build a Crushed Stone Patio 2024, May
Crushed Stone Blind Area (24 Photos): What Crushed Stone Is Needed For A Blind Area Around The House? DIY Step-by-step Instructions For Filling, Diagram
Crushed Stone Blind Area (24 Photos): What Crushed Stone Is Needed For A Blind Area Around The House? DIY Step-by-step Instructions For Filling, Diagram
Anonim

To protect the house from flood, rainwater, it is necessary to build a blind area. It will require a variety of materials. Who knows the features and arrangement of the crushed stone blind area, they choose this particular material.

Image
Image

Advantages and disadvantages

The blind area is a moisture-impermeable strip that runs along the perimeter of the building and slopes away from the building. This is a multilayer structure, which is made using the same technology, the only difference is the top layer. You can choose a hard surface such as concrete, tiles or artificial stone.

The best option would be the so-called soft base - a crushed stone blind area

Image
Image
Image
Image

Crushed stone construction is easy to manufacture, can be used in any climatic zone, on different soil.

The positive aspects of this material:

  • improves the thermal insulation of the house;
  • affordable cost;
  • does not undergo deformation when the foundation subsides;
  • repair is simple, there is no need to invite specialists;
  • no risk of cracking;
  • good resistance to sudden temperature changes;
  • work with crushed stone is carried out without special construction skills and additional equipment;
  • there is a large selection of decorative gravel on sale, which allows you to create unusual design solutions, for example, planting plants around the house directly in the blind area.
Image
Image
Image
Image
Image
Image

The disadvantages of this type are the need for repairs. After 7 years, it is necessary to redo the blind area . And you will also need regular surface care. It is necessary to clean the surface of dry leaves, branches, other debris from the site, monitor the external condition.

There is a possibility of overgrowing of rubble with weeds.

Image
Image

What kind of crushed stone is needed?

The performance of the functions of the structure largely depends on the correct selection of material. Crushed stone is different, high-quality is produced from rocks - limestone, granite . There is secondary crushed stone, which is crushed from construction waste, for example, concrete. It will be cheaper, but also inferior in quality characteristics - hardness, resistance to temperature extremes, cold. The choice of crushed stone depends on personal preferences, financial capabilities, brand, climate, type of building. It should be borne in mind that limestone, dolomite crushed stone tolerates temperature fluctuations well. Gravel tolerates frost well. Crushed granite is often used in the construction of multi-storey buildings.

Image
Image

For the construction of the blind area, different rubble is used. The quality of the installation depends on the size of the stone.

  • The smallest size is up to 5 mm. Used for final dusting.
  • Small size of crushed stone - up to 20 mm. It compresses best of all.
  • The average size of stones is up to 40 mm. Nice view, but such rubble is difficult to stack.
  • Coarse fraction - from 40 mm. It is difficult to work with it, so it is better not to buy it.

For a reliable blind area, experts recommend a mixture of 5 to 40 mm in size. It will cost less, it will be easier to ram, it will look more interesting.

Image
Image

Tools and materials

Before starting construction, you need to prepare everything you need for work. You will need clay, it is divided into several types. It is necessary to take oily - this is the name of clay, which contains little sand. You also need to buy bituminous mastic, a material for waterproofing, more practical in rolls . If insulation is required, a heat-insulating material is purchased. It is needed when building a house in a cold climate and a basement with heating. Experts advise extruded polystyrene foam. A thickness of 10 cm is suitable.

You can replace it with foam.

Image
Image
Image
Image

For drainage, you will need clean, riverine coarse sand . A 3-5mm size is good. You will need geotextiles with a density of 100-150 g / sq. m. This is a non-woven material that allows water to pass through well. Sold in rolls, which is good for buying the desired length. It is used to separate layers.

Image
Image
Image
Image

Step-by-step instruction

In order to correctly complete the blind area with your own hands, it is important to observe the scheme, order and size of the layers. The blind area is a kind of multilayer cake.

There are different types of blind area . When constructing from concrete, it is important to observe the ratio of cement in the composition. In this case, 1-2 times a year it will be necessary to eliminate the cracks that have appeared. This is the main disadvantage of the concrete type of blind area. Laying out paving slabs requires the involvement of a specialist. The material is laid on a kind of cushion of crushed stone and sand, based on clay, lasts a long time, looks attractive. But laying out tiles is considered the most expensive type.

The crushed stone blind area is suitable for any foundation - tape, columnar, on screw piles, it can be made insulated . The design device is simple, you can do it yourself.

Filling with crushed stone is the most budgetary way.

Image
Image
Image
Image

Layout and planning

When starting to manufacture a structure, it is necessary to calculate the volume. The correct width of the blind area is needed for the high-quality performance of its task . To calculate it, you need to know the type of soil, the length of the roof protrusion. For ordinary soil, 60 cm is enough, when the soil subsides, a width of 1 m is required. The width of the finished structure should exceed the projection of the roofs by 20 cm, if the area allows, then it is better to make from 30 to 35 cm. The blind areas should be built with a slope of 0.03, then there are 3 cm by 1 m in width.

To determine the length of the ledge of the cornice, you need to climb the ladder to the roof of the house, attach a long plumb line to the edge, mark the place of projection of the load on the ground, drive in a peg . Add the required distance to this value. Mark the distance with pegs with a step size of 1.5 meters around the entire perimeter of the house, for this you need to pull a rope between the pegs.

Image
Image
Image
Image

Earth

Along the resulting border, a trench 50 cm deep should be dug. The bottom should be leveled with a shovel and tamped.

Image
Image

Arrangement

Then several actions are performed sequentially

  1. The first layer is laid out of clay, it must be done at an angle. Clay is laid in a layer 15 cm thick. It is leveled with shovels, carefully rammed.
  2. The second level is needed for waterproofing. Roofing material or polyvinyl chloride film is rolled out. For better insulation on the foundation, allowances are made to the walls of the trench, the pieces are overlapped with each other by about 10 cm. The joints are coated with bitumen.
  3. If you decide to lay a heat-insulating layer, then make it the next layer. Seams are coated with any sealant. Cover the top with a thick polyethylene or polyvinyl chloride film.
  4. This is a drainage layer, it will be made of sand 10-15 cm thick. It must be carefully leveled with shovels, carefully tamped.
  5. The next layer will be protective. He will not allow subsidence of stones, the spread of weeds. A geotextile cloth is placed on the sand. It can be treated with chemical weed control.
  6. On top you need to lay out crushed stone. It should be flush with the ground. Tamp the layer with a vibratory rammer.

From above, you can plant greens, flowers, lay the lawn in rolls, cover with decorative stones or leave compacted rubble.

Image
Image
Image
Image

Recommendations

To build a reliable structure, you need to heed the advice of experts and builders

  • Building materials should be of high quality. The presence of moisture, mold in the basement, house depends on a good blind area.
  • It is important that the blind area fits tightly to the foundation of the building. Water can flow into the gap, freeze, expand, enlarge the gap. This will lead to a gradual distance from the blind area from the foundation. The structure will not be able to perform its tasks well.
  • Calculations must be carried out correctly, taking into account every millimeter.
  • There is no need to postpone the work of making the blind area. It must be done one year after the building was built.
  • For the construction of a crushed stone blind area, it is important to know the level of groundwater. They must be at least 1 meter long.
  • A layer of rubble and clay should be at a certain angle. This will ensure that water flows into the ground.
  • To repair the blind area less often, it is necessary to make drainage systems on the roof.
Image
Image
Image
Image

You can do some types of construction work yourself. It is not particularly difficult to make a crushed stone blind area. This building material has its positive and negative sides, but it is often chosen for work on the improvement of sites . Having information, step-by-step instructions, you can make a blind area. The structure will provide drainage of rain, melt water from the building, will serve as a decorative element, if you apply design solutions in the arrangement.

Recommended: